Posts

Showing posts from July, 2019

HYDERABAD METRO RAIL

Image
                                             BHAGYA NAGAR METRO RAIL INTRO: Hyderabad Metro Rail is a new modern way of the mass transport system. It is a new way of transport to reach the destination quickly. It is the second-largest metro project in India. where 90% is L&T undertaken and 10% is GOVT OF TELANGANA undertaken.up to now the total cost of the project is 18,800 cr.which is Initiated in March 2012& completed in 28th November 2017 inaugurated by SHRI.NARENDRA MODI GARU , PRIME MINISTER OF INDIA. TECHNICAL INFO: system length:72kms but 56.5kms is operational No of tracks: 2 Track Gauge:1,435mm Electrification:25kv,AC overhead catenary Average speed:35km/h Top speed:80km/h  METRO ROUTE MAP: The route map of HMRL is classified into 3 lines those are;